FLOORING

SPECIALIZED FLOORING / CONCRETE SYSTEMS

INDUSTRIAL FLOORING
SYSTEMS

RAM ARBIA delivers engineered concrete flooring solutions for warehouses, industrial facilities, logistics operations, commercial environments and heavy-duty applications. Our flooring approach integrates slab engineering, subgrade conditions, operational loading, joint strategy, concrete placement, flatness requirements and long-term floor performance.

Industrial concrete flooring system for warehouse by RAM ARBIA Saudi Arabia
INDUSTRIAL FLOORING SYSTEMS SLAB · LEVELNESS · JOINTS · LOADS · OPERATION
01 Industrial Concrete Floors
02 High-Flatness Flooring
03 Jointed & Jointless Systems
01 / OVERVIEW
BUILT AROUND OPERATIONS

The floor is part
of the facility.

Industrial flooring carries more than people. It supports racking systems, forklifts, machinery, trucks, storage loads and the daily movement that defines the operation of a facility.

RAM ARBIA approaches flooring as an integrated concrete system in which loading, ground conditions, slab geometry, reinforcement, joints, flatness and execution must work together.

FLOOR PERFORMANCE

Designed from the ground
up for long-term use.

Floor performance begins below the finished surface. Subgrade conditions, structural loads, concrete behavior, reinforcement, joint design and operational movement all influence the completed slab.

01 Load Capacity

Floor systems developed around racking, equipment, vehicles and operational loads.

02 Flatness

Surface control supports smooth movement and demanding industrial operations.

03 Joint Strategy

Joint layout influences traffic, maintenance and long-term slab behavior.

04 Surface Durability

The completed floor must respond to abrasion, traffic and daily operational use.

05 Maintainability

Floor design should consider future repairs, joints and operating continuity.

06 Lifecycle Value

Flooring decisions should consider long-term performance beyond initial placement.

OPERATIONAL LOADS
FINISHED SURFACE
CONCRETE SLAB
BASE LAYER
SUBGRADE
CONCEPTUAL INDUSTRIAL FLOOR SYSTEM
COMPLETE FLOOR SYSTEM

Performance begins
below the surface.

A high-performance floor cannot be evaluated by its finish alone. The supporting layers, slab thickness, reinforcement, joint layout and surface requirements must work as one system.

01 Subgrade condition
02 Base preparation
03 Slab thickness & geometry
04 Reinforcement strategy
05 Joint configuration
06 Final surface & tolerance requirements
FLOORING CAPABILITIES

One flooring system.
Multiple specialized disciplines.

RAM ARBIA's flooring capabilities extend from floor application and slab planning to specialized joint strategies, laser-controlled placement and steel fiber reinforced concrete.

FLOOR CONFIGURATIONS

Different structures require
different slab solutions.

Flooring configuration should respond to structural support conditions, the existing substrate and the intended use of the finished area.

01 Ground-Bearing Concrete Slabs
02 Mezzanine Floor Slabs
03 Over-Screed Concrete Floors
04 Structural & Suspended Slabs
05 Warehouse Flooring
06 Heavy-Duty Industrial Floors
FLATNESS & LEVELNESS

Floor tolerance becomes
an operational requirement.

Warehouses and industrial environments may require different floor tolerance strategies depending on vehicle movement, racking layout, aisle configuration and material handling systems.

CONTROLLED FLOOR PROFILE
01 Free-Movement Floors
02 Defined-Movement Areas
03 Very Narrow Aisle Operations
04 High-Flatness Floor Requirements
05 Laser-Controlled Placement
06 Final Surface Verification
OPERATIONAL LOADS

Design the floor around
what moves above it.

Industrial floor behavior depends on both static and moving loads. Equipment, storage systems and traffic patterns should therefore be considered before final slab configuration.

01 Racking Systems
02 Forklift Traffic
03 Truck Movement
04 Heavy Machinery
05 Concentrated Equipment Loads
06 Stored Material Loads
JOINT STRATEGY

Every joint affects
how the floor operates.

Joint layout should respond to slab behavior, floor geometry and operational movement. In high-traffic environments, joint locations can influence forklift travel, maintenance requirements and long-term floor condition.

01 Jointed Floor Systems
02 Reduced-Joint Floors
03 Large-Panel Floors
04 Construction Joint Coordination
05 Traffic Route Coordination
06 Joint Maintenance Planning
FLOORING APPLICATIONS

Concrete floors built
around the environment.

Different operations place different demands on a concrete floor. The final solution should respond to building use, loading, traffic, surface requirements and maintenance expectations.

01

Warehouses

02

Logistics Centers

03

Manufacturing Facilities

04

Industrial Buildings

05

Commercial Facilities

06

Garages & Parking Areas

FLOOR SYSTEM SELECTION

Start with the operation.
Then engineer the floor.

There is no single industrial flooring system suitable for every project. Slab configuration should be selected around project-specific ground conditions, loading and operational needs.

01 Subgrade Condition
02 Floor Loading
03 Racking Configuration
04 Forklift & Vehicle Traffic
05 Flatness Requirements
06 Joint Strategy
07 Reinforcement Strategy
08 Long-Term Maintenance
HOW WE DELIVER

From operational requirements
to finished concrete floor.

Industrial flooring requires coordination before concrete reaches the site and control throughout preparation, placement, finishing and final verification.

01

Assess

Review use, loads, ground conditions and floor requirements.

02

Engineer

Coordinate slab, reinforcement and joint strategy.

03

Prepare

Prepare subgrade, base layers and construction zones.

04

Place

Execute controlled concrete placement and screeding.

05

Finish

Complete surface finishing, curing and protection.

06

Verify

Review completed floor condition and project requirements.

FLOORING PRIORITIES

Quality is built
into every layer.

Floor performance depends on the relationship between design, material, preparation, construction and the operational environment.

01 Correct subgrade assessment +
02 Project-specific slab engineering +
03 Appropriate reinforcement strategy +
04 Coordinated joint layout +
05 Controlled concrete placement +
06 Floor flatness and level control +
07 Proper finishing and curing +
08 Final floor quality verification +
RAM ARBIA / INDUSTRIAL FLOORING SYSTEMS

Floors engineered around how facilities operate.

RAM ARBIA

Let's start a conversation.

Welcome to RAM ARBIA. We would be pleased to hear from you and connect with you regarding your business requirements.

Office Location
Dammam — Eastern Province KSA - Dammam - Al Khalij Rd - Al Zuhur District - Al-Khawaja Tower

Floor No 02 — Office No 202
Floor No 03 — Office No 302
Floor No 05 — Office No 504 View on Google Maps
RAM ARBIA · TRADING & CONTRACTING · KSA
UP