RAM ARBIA delivers internal concrete flooring for industrial, warehouse, commercial and institutional environments, integrating slab preparation, reinforcement strategy, concrete placement, level control, screeding, finishing, joint coordination, curing and final floor verification around the operational requirements of each facility.

Internal concrete floor finishing using power trowel by RAM ARBIA Saudi Arabia
INTERNAL CONCRETE FLOOR SYSTEMS PLACEMENT · LEVEL CONTROL · FINISHING · JOINTS · CURING
01 Concrete Slab Placement
02 Level & Flatness Control
03 Power-Trowel Floor Finishing
01 / OVERVIEW
CONCRETE AS THE FINISHED FLOOR

The slab is not only structure.
It can be the working surface.

Internal concrete flooring combines the structural and operational functions of a concrete slab. The finished surface may remain exposed, receive a surface treatment, or form the substrate for a later flooring system depending on project requirements.

RAM ARBIA approaches internal concrete flooring around how the facility will actually operate. Slab support, loads, reinforcement, joints, floor tolerances, surface finish, curing and future flooring requirements must be coordinated before placement begins.

FLOOR PERFORMANCE

Design the slab
around the operation.

Internal concrete floors are affected by traffic, equipment, stored loads, racking, surface-finish requirements and maintenance conditions. The appropriate slab and finishing strategy therefore depends on the facility.

01 Load Support

Slab design and support conditions should respond to the loads acting on the completed floor.

02 Floor Flatness

Surface tolerance requirements are selected around equipment movement, operations and final floor use.

03 Surface Durability

Concrete mix, finishing and curing influence the quality of the finished working surface.

04 Joint Performance

Joint design and execution affect floor movement, crack control and operational continuity.

05 Finish Quality

Screeding and finishing operations establish the final surface profile and visual condition.

06 Lifecycle Maintainability

Floor design should consider joints, traffic routes, cleaning and future maintenance from the beginning.

FINISHED SURFACE
CONCRETE SLAB
BASE / SUPPORT LAYER
SUBGRADE / STRUCTURAL SUPPORT
POWER-TROWEL FINISHING
CONCEPTUAL INTERNAL CONCRETE FLOOR BUILD-UP
COMPLETE FLOOR SYSTEM

The finished surface
starts below the slab.

For ground-bearing floors, support conditions below the concrete influence the behaviour of the completed slab. For other internal floor configurations, the supporting structure and interface conditions must be coordinated with the concrete flooring design.

01 Supporting structure or prepared base
02 Separation or interface layers where specified
03 Reinforcement strategy
04 Concrete slab placement
05 Joint and edge detailing
06 Final surface finishing and curing
FLOOR CONFIGURATIONS

Different structures.
Different slab interfaces.

Internal concrete flooring can be delivered in different configurations depending on the supporting structure, operational loads and final flooring requirement.

01 / GROUND-BEARING

Slab-on-Ground Flooring

Internal concrete floor supported by prepared ground and base layers, with slab design, reinforcement and joint strategy coordinated around the required operational performance.

02 / STRUCTURAL

Structural & Suspended Floors

Concrete floor surfaces constructed over structural floor systems where finishing strategy and floor tolerances must respond to the behaviour of the supporting structure.

03 / TOPPING

Concrete Topping Floors

Concrete topping layers may be used over suitable structural substrates when required by the project floor build-up and final surface strategy.

04 / FINISHED CONCRETE

Exposed Finished Concrete

Power-finished concrete can remain as the final internal floor surface in suitable industrial, warehouse and service environments.

DESIGN
FLOOR DESIGN INPUTS

Understand the loads
before placing the concrete.

Floor configuration should be developed around the building structure and operating requirements. The same slab solution should not be applied automatically to every internal space.

01 Racking & Storage Loads
02 Forklift & Wheeled Traffic
03 Machinery & Equipment
04 Concentrated Loads
05 Supporting Ground / Structure
06 Joint Layout Requirements
07 Floor Tolerance Requirement
08 Final Surface / Coating Requirement
PLACE
CONCRETE PLACEMENT

Placement sequence influences
the finished floor.

Concrete delivery, placement sequence, elevation control, screeding and finishing operations should be coordinated before each floor placement. The selected method should respond to floor size, structural configuration and specified surface tolerances.

CONCRETE PLACEMENT · ELEVATION CONTROL · SCREEDING
01 Placement Planning
02 Concrete Delivery Coordination
03 Elevation Control
04 Controlled Concrete Distribution
05 Screeding & Levelling
06 Placement Continuity
LEVEL
FLATNESS & LEVELNESS

Floor tolerances should match
how the space will operate.

Warehouses, commercial facilities, industrial areas and equipment spaces can require different floor-tolerance strategies. Flatness and levelness requirements should therefore be defined by the project rather than applying one universal value to every floor.

01 General Internal Floors
02 Warehouse Traffic Areas
03 Racking Environments
04 Defined-Movement Areas
05 Equipment Installation Areas
06 Final Surface Verification
FINISH
CONCRETE FINISHING

Screed the floor.
Finish the surface.

After concrete placement and initial levelling, finishing operations are selected according to the required final surface. Power-trowel finishing can create a dense, smooth concrete surface for suitable internal flooring applications.

01 Initial Levelling
02 Floating
03 Power Trowel Finishing
04 Edge Finishing
05 Local Surface Correction
06 Final Finish Review
JOINT
JOINT COORDINATION

Concrete moves.
The floor must account for it.

Construction joints, contraction joints, isolation interfaces and reinforcement strategy should be coordinated around slab behaviour, placement sequence and facility use. Detailed joint-system design remains separate from the dedicated Jointed & Jointless Flooring service.

CONCEPTUAL CONCRETE FLOOR JOINT
01 Construction Joint Layout
02 Contraction Joint Coordination
03 Isolation Interfaces
04 Joint Load Transfer
05 Saw-Cut Coordination
06 Traffic Route Coordination
REINFORCE
REINFORCEMENT STRATEGY

Reinforcement belongs
to the slab design.

Internal concrete floors may use different reinforcement approaches depending on the structural and operational design. The selected method should be coordinated with slab thickness, support conditions, joints and loading rather than treated as a universal specification.

01 Conventional Reinforcement
02 Steel Fiber Reinforcement Where Designed
03 Local Reinforcement
04 Opening & Edge Coordination
05 Joint Reinforcement
06 Structural Design Integration
CURE
CURING & PROTECTION

Finishing ends.
Concrete development continues.

The floor should be protected after finishing using the curing strategy specified for the concrete system and final surface requirement. Subsequent construction traffic must also be coordinated to avoid unnecessary damage to the newly completed floor.

01 Specified Curing Method
02 Early-Age Floor Protection
03 Controlled Construction Traffic
04 Joint Cutting Coordination
05 Surface Condition Monitoring
06 Final Floor Verification
SURFACE
FINAL FLOOR STRATEGY

Finished concrete or
substrate for another system.

Internal concrete flooring may remain as the completed exposed floor or become the receiving substrate for another flooring system. That decision should be established before finishing and curing because it can influence final surface preparation requirements.

01 Exposed Power-Trowelled Concrete
02 Surface-Hardened Concrete Where Specified
03 Concrete for Epoxy Coating
04 Concrete for Resinous Flooring
05 Concrete for Tile / Finish Systems
06 Future Floor Renovation Strategy
INTERNAL FLOOR APPLICATIONS

Concrete floors built
around facility operations.

Internal concrete flooring can support a wide range of facilities when slab design, placement and finish are coordinated with operational requirements.

01

Warehouses & Logistics Facilities

02

Manufacturing & Industrial Buildings

03

Workshops & Service Areas

04

Commercial Buildings

05

Parking & Internal Vehicle Areas

06

Technical & Institutional Facilities

FLOOR
SERVICE DISTINCTION

One concrete floor.
Several specialist disciplines.

Internal Concrete Flooring focuses on the complete concrete floor itself. Related RAM ARBIA flooring services address specific parts of that wider system.

INTERNAL CONCRETE FLOORING Concrete slab placement, finishing, curing and final floor
JOINTED / JOINTLESS Joint strategy and slab-panel configuration
LASER SCREED Screeding and level-control technology
STEEL FIBER Reinforcement technology within engineered slabs
EPOXY FLOORING Resin coating applied over prepared concrete
FLOORING APPLICATION Broader flooring execution and finishing services
SELECT
FLOOR SYSTEM SELECTION

Select the floor
around the building.

The appropriate internal concrete flooring system should respond to support conditions, loads, traffic, floor tolerances, reinforcement, joints, finish requirements and future maintenance strategy.

01 Structural / Ground Support
02 Slab Design Requirements
03 Reinforcement Strategy
04 Joint Strategy
05 Traffic & Operational Loads
06 Floor Tolerance Requirement
07 Final Surface Finish
08 Maintenance & Future Use
HOW WE DELIVER

From floor requirements
to completed concrete surface.

Internal concrete flooring requires coordination before, during and after placement to achieve the intended structural and operational floor performance.

01

Assess

Review facility use, support and floor requirements.

02

Coordinate

Coordinate slab, reinforcement, joints and interfaces.

03

Prepare

Prepare the supporting floor assembly and placement area.

04

Place

Place, distribute and screed the concrete.

05

Finish

Complete levelling, finishing and joint operations.

06

Cure & Verify

Cure, protect and review the completed floor.

FLOORING PRIORITIES

Good floors are planned
before the concrete arrives.

Internal concrete flooring performance depends on the complete relationship between design, preparation, concrete placement, finishing, joints and curing.

01 Clear operational floor requirements +
02 Suitable support and slab configuration +
03 Coordinated reinforcement and joint strategy +
04 Controlled concrete placement sequence +
05 Accurate elevation and screeding control +
06 Consistent finishing operations +
07 Appropriate curing and floor protection +
08 Final floor inspection and verification +
RAM ARBIA / INTERNAL CONCRETE FLOOR SYSTEMS

Concrete placed, levelled and finished around how the facility operates.

RAM ARBIA

Let's start a conversation.

Welcome to RAM ARBIA. We would be pleased to hear from you and connect with you regarding your business requirements.

Office Location
Dammam — Eastern Province KSA - Dammam - Al Khalij Rd - Al Zuhur District - Al-Khawaja Tower

Floor No 02 — Office No 202
Floor No 03 — Office No 302
Floor No 05 — Office No 504 View on Google Maps
RAM ARBIA · TRADING & CONTRACTING · KSA
UP